Sprayroq® Certified Partners (SCP)

Sprayroq provides its unique product line through a growing rank of contractors known as Sprayroq Certified Partners (SCPs). Our Partners are licensed to properly apply Sprayroq product in specific, protected geographic territories.

LOCATE AN APPLICATOR

INFORMATION/STATS

New contractors must complete two weeks of rigorous training (one week in our state-of-the-art corporate facility, and a week back in their home territory) with our    

• Materials
• Equipment
• Application techniques
• Cleanup and maintenance procedures
• Marketing and promotion
• Customer service
• Upon successful completion of this course, applicators are prepared not just to correctly apply our lining materials, but also to make fact-based judgments about real-world conditions that will ensure the integrity of every installation they perform.


To ensure the highest standards of materials application and the maximum results for our customers, all new contractors must receive Certification to SCP status from the president of Sprayroq, prior to offering structural and surface rehabilitation and protection service using our lining products and application equipment.SCPs must submit to annual skills review to maintain their certification.

Independent 3rd Party Test Results
Accurate Ratio Testing Through Density 2018

Accurate Ratio Testing Through Density 2018

Available in PDF download (1 Page)

Download PDF
Density Test Procedure

Density Test Procedure

Available in PDF download. (1 Page)

Download PDF
NACE Standards Detailed

NACE Standards Detailed

Available in PDF download. (26 Pages)

Download PDF
Output Calculation for SprayWall and the Graco Reactor HVR

Output Calculation for SprayWall and the Graco Reactor HVR  11.6.18

Available in PDF download. (1 Page)

Download PDF
Output Calculation for SprayWall and the Graco Reactor HVR

Output Calculation for SprayWall and the PMC PHX 11.6.18

Available in PDF download. (1 Page)

Download PDF
Output Calculation for SprayWall and the Graco Reactor HVR

SprayWall Inspection Protocol Guidelines 10.12.18

Available in PDF download. (4 Pages)

Download PDF
Output Calculation for SprayWall and the Graco Reactor HVR

SprayWall Test Plate Procedure 2018

Available in PDF download. (3 Pages)

Download PDF
Output Calculation for SprayWall and the Graco Reactor HVR

Square Foot Calculation Basics

Available in PDF download. (2 Pages)

Download PDF

INTERESTED?

Simply fill out this form and our recruiting team will soon be in contact with you in order to discuss the possibility of joining the Sprayroq family!

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.

In a hurry? Call Now!

 800-634-0504 x302